Videos

Winching mulitple cables through conduit.

Moving around obsticles with ease.

Making light work of heavy cable.

A drum was damaged in transport; we were engaged by the cable manufacturer to re-spool the cable onto a new drum which lead us to install all underground cable on site.

With the trench being not suitable for people to enter.

Our first configuration for handling 25-tonne drums.

With under bores, we suck through the appropriate amount of cable onto a machine on the other side, then simply drive the truck one way and the tractor the other.

This cable tray was 6.0 metres high.

Our new tractor implement, designed, built and patented inhouse

With our entry into mining, we came up with a suitable design for above-ground cable installation.